REBAR HUB TO BE LEFT IN CONCRETE

REBAR HUB TO BE LEFT IN CONCRETE

It is implemented in reinforced concrete wall molds in a way that it will be in contact with both the structural iron and the formwork. It is tightened with formed spring clamp and removed from the concrete when the concrete is poured and the mold is obtained.

CODE REFERENCE A (mm) L (mm) D (mm) PACKAGE
QTY UNIT
1200080040 8x40 08 40 50 1.000 Piece
1200100040 10x40 10 40 50 1.000 Piece
1200120030 12x30 12 30 50 1.000 Piece
1200120040 12x40 12 40 50 1.000 Piece
1200140040 14x40 14 40 50 1.000 Piece
gurbetciler